Skip to product information
1 of 3
Vendor: Liago

EVM 2.5″ SATA External HDD/SSD Enclosure | USB 3.0/3.1 Casing | Tool-Free Installation & Durable Design

Regular price
Rs. 809.00
Regular price
Sale price
Rs. 809.00
Low stock: 1 left

Description

EVM 2.5″ SATA External HDD/SSD Enclosure | USB 3.0/3.1 Casing | Tool-Free Installation & Durable Design
EVM 2.5″ SATA External..

Rs. 809.00

  • Description
  • Product Reviews
  • Privacy policy
  • Tab heading
  • Tab heading
  • Brand: EVM

  • Product Type: 2.5″ SATA HDD/SSD External Casing / Enclosure

  • Supported Drives: 2.5″ SATA HDDs and SATA SSDs (up to ~9.5 mm thickness)

  • Interface: USB 3.x (USB 3.0 or USB 3.1 / Type‑C on certain models)

  • Installation: Tool‑free plug‑and‑play design                                                                    

    About This Item

    • Compatible with 2.5″ SATA HDDs and SSDs — easily convert internal drives into portable external storage.

    • High‑speed USB 3.x interface — enables fast data transfer for backups, media, and large file access.

    • Plug & Play — no drivers required; connect via USB and start using instantly.

    • Portable & Compact Design — lightweight enclosure ideal for travel, office, and home use.

    • Durable Build — protects your internal drive while in use and during transport.

    • Wide System Compatibility — works with Windows, macOS, and Linux devices supporting USB storage.

    •  

Shipping cost is based on weight. Just add products to your cart and use the Shipping Calculator to see the shipping price.

We want you to be 100% satisfied with your purchase. Items can be returned or exchanged within 30 days of delivery.

You may also like

Recently viewed product

Money Return
Free Delivery all over India
Welcome to store
24/7 Online Support